Honeywell Site Repurpose

Owner: Honeywell

Upon receiving a request for our involvement in a fast-paced, government-based emergency funded industrial project, we responded within hours and provided a proposal and solution within days. With limited design input at the time, we committed to ensuring an operational facility in under 30 days. The scope of the project turned out to include installing three, 400hp, 1600 CFM @125psi rotary lubricated compressors, a 6000cfm air separator tank and receiver, 2000+ ft of aircom piping and 300 airline drops with regulators. Along with all of that, we installed new sinks, plumbing fixtures and necessary LN2 piping to make the space functional before it was scheduled to open.