At this wastewater treatment facility for Trinity River Authority our team installed a new Central Utility Plant with water feeding from the Trinity River. The new central plant consisted of new chillers, primary and secondary pumps, piping, insulation, and all ancillary mechanical work in the plant. In addition to the plant, our solution included removing the existing cooling system with a chilled water loop system with new piping to all outlying buildings with the new central plant.