Growth Property Group – 3880 Hulen St.

At this commercial building in Ft. Worth, our team worked with the owner to evaluate the exiting Controls system that comprised of several different systems.  The solution was to integrate these systems into a single, easy to use system. Our scope included installing a JACE controller for 125 devices, and installing nearly 100 VAV controllers, … Continued

Southlake Town Hall

At the Southlake Town Hall, we were excited to be a part of this complex project. This project was a dynamic solution replacing their rooftop cooling tower and installing two new air-cooled chillers, pumps, and associated piping. Outside of the central plant, each air handling unit in the four-story building was replaced with new energy … Continued

Frito Lay

Infinity partnered with Frito Lay in 2006 and has completed various projects through the years. One of which was the refurbishment of the Bean Dip Cookers (Retort Cookers), the only ones in the United States, for cooking “Frito Lay Bean Dip.” These cookers are considered critical, therefore, there was only a two-day window allowed for … Continued

Trinity River Authority

At this wastewater treatment facility for Trinity River Authority our team installed a new Central Utility Plant with water feeding from the Trinity River. The new central plant consisted of new chillers, primary and secondary pumps, piping, insulation, and all ancillary mechanical work in the plant. In addition to the plant, our solution included removing … Continued

Tarrant County Corrections Center

At Tarrant County Corrections Center we retrofitted two large water-cooled chillers with magnetic bearing chillers, six pumps and a 100-gallon expansion tank from the second floor mechanical room, while maintaining building load for inmates with temporary chillers on the street below. Additionally, we provided complete re-furbishing of concrete cooling towers on the roof in a … Continued

Parker County Courthouse

Infinity has had a long history with Parker County and, more specifically, with the Historic Courthouse on the island square in the center of the traffic circle in Weatherford. This building was previously retrofitted with DX air conditioning units that surrounded the building. In the early 2000’s, when the historical commission decided that this needed … Continued

Texas A&M University School of Law

At the School of Law for Texas A&M, the University needed a replacement of one of their failing Cooling Towers. Through the Pre-Construction phase we identified the proper solution for the replacement of the Tower and identified the failed Water Filtration system feeding the existing Tower. Our team worked with the University’s schedule, since classes … Continued

Grand Prairie ISD

At Grand Prairie ISD, our team pushed the envelope to do a multi-campus HVAC upgrade project during the short summer break schedule to ensure cooling was available for the start of school. Over the four campuses in the district, our team installed 163 water source heat pumps, 124 roof top packaged units, and 8 split … Continued

Kings Park

In working directly with the property owner and engineer, we evaluated the mechanical and controls systems performance and identified efficiency and lifespan measures that would best serve the building moving forward. The solution was to create a phased approach to upgrade the buildings equipment and energy efficiency measures. We utilized the existing Controls system to … Continued

Colleyville Justice Center

At the Colleyville Justice Center, we completed an entire HVAC retrofit of the facility. The scope of work consisted of several large tonnage Intellipaks’s, multiple roof top units, split-systems, and all associated air distribution, curbs, electrical and condensate drains. This project was completed on a tight schedule, with the parameters the building remain climatized during … Continued